BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20230725T123000Z
DTEND:20230725T210000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Principles of Lean Manufacturing with Live Simulation - Live North
DESCRIPTION:Implementing lean principles are extremely beneficial for manufacturing companies. The elimination of waste (muda)\, continuous improvement (kaizen) as well as pull-systems (kanban) will be illustrated in live demonstrations for practical\, comprehensible knowledge of Lean Manufacturing.\n\n\n\nLean Manufacturing training is based on principles that can be implemented and will become the strong foundation of your organization and employees.\n\n\n\nObjectives\n\nBasic Concepts of Lean Manufacturing   Elimination of Waste\n\nOverproduction Overproduction\n\nWaste of Unnecessary Motion\n\nWaste of Inventory\n\nProduction of Defects\n\nWaste of Waiting\n\nWaste of Transportation\n\nWaste of Over Processing\n\nLive Demonstration of the Tools and Methodology Necessary to Implement "Lean" on the Shop Floor\n\nUnderstanding of non-value added activities in manufacturing\n\nLearn how to improve productivity by:\n\napplying standard work\n\nusing visual controls\n\nset-up reduction\n\nbatch size reduction\n\npoint-of-use storage\n\nquality at the source\n\npull systems
X-ALT-DESC;FMTTYPE=text/html:Implementing lean principles are extremely beneficial for manufacturing companies. The elimination of waste (muda)\, continuous improvement (kaizen) as well as pull-systems (kanban) will be illustrated in live demonstrations for practical\, comprehensible knowledge of Lean Manufacturing.<br />\n<br />\nLean Manufacturing training is based on principles that can be implemented and will become the strong foundation of your organization and employees.<br />\n<br />\nObjectives<br />\nBasic Concepts of Lean Manufacturing &ndash\; Elimination of Waste<br />\nOverproduction Overproduction<br />\nWaste of Unnecessary Motion<br />\nWaste of Inventory<br />\nProduction of Defects<br />\nWaste of Waiting<br />\nWaste of Transportation<br />\nWaste of Over Processing<br />\nLive Demonstration of the Tools and Methodology Necessary to Implement &ldquo\;Lean&rdquo\; on the Shop Floor<br />\nUnderstanding of non-value added activities in manufacturing<br />\nLearn how to improve productivity by:<br />\napplying standard work<br />\nusing visual controls<br />\nset-up reduction<br />\nbatch size reduction<br />\npoint-of-use storage<br />\nquality at the source<br />\npull systems
LOCATION:Live - Cedar Knolls\, NJ
UID:e.2857.1405
SEQUENCE:3
DTSTAMP:20260515T044146Z
URL:https://business.shccnj.org/events/details/principles-of-lean-manufacturing-with-live-simulation-live-north-1405
END:VEVENT

END:VCALENDAR
